Disco led light 19x30w 4in1 RGBW 3 zone ring control led moving head zoom wash light

FOB Reference Price:Get Latest Price
US $591-610 / Piece | 2 Piece/Pieces stage equipment (Min. Order)
Supply Ability:
500 Piece/Pieces per Week professional lighting
Port:
Guangzhou
Report Suspicious Activity
Overview
Quick Details
Light Source:
LED
LED Light Source:
Tianxin
Type:
Moving Head Lights
Input Voltage(V):
AC 100v-240v/ 50-60hz
Lamp Power(W):
600
Lamp Luminous Flux(lm):
8400
Lamp Luminous Efficiency(lm/w):
16450
CRI (Ra>):
70
Color Temperature(CCT):
Other
Working Temperature(℃):
-20 - 45
Working Lifetime(Hour):
50000
IP Rating:
IP20
Certification:
CE, EMC, LVD, RoHS
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Beyond
Model Number:
BY-M45
Emitting Color:
RGBW 4in1
Beam angle:
6-55 degree
Power consunption:
600w
Power voltage:
AC 100-240V, 50/60Hz
DMX channel:
19/27 channel
Control modes:
DMX512, sound-control, Auto,master-slave
Dimension:
38*24*50cm
Display:
180°reversible LCD Display
Warranty:
2 years
Power socket:
Powercon in/out
Weight:
14.2Kgs
Packaging & Delivery
Packaging Details
innner and outside package are kraft of carton with EPE
Delivery Time
according to your orders
Video Description

 What's the Specification ?

specification
Light Sources19 pieces 30W RGBW 4-in-1 LED
Beam Angle6°-55°
Power Consumption600 w
DMX Channel19/27 Channel
Control Modes
DMX512/Auto-Run/Master-Slaver/Sound
Display180°reversible color LCD display
Protection RatingIP20
Pan & Tilt3 phase motors
Pan& Tilt:540°/270° 
Dimension

38x24x50 cm

NW14.2 kgs

 What's Product description?  

Product Description

 

What are our tests for products?

R&D+quality control

R&D dept have 4 engineers, all of them have 4-7 years experiences in stage lighting.Each year at least 5 series new products will be launched into market. All products passed CE(EMC,LVD) & RoHSstandard In order to make product be stable, we process very strickly quality control policy
Have 7 staffs in QC Dept.
ICQ check all materials before them ready to production line.
QC do all lighting performance and appearance inspect when finished assembled before packing.
1. all materials will be 100% certainly inspect,any defect materials will be returned and not used.
2. Each fixture will be done at least 12 hours performance testing after assembled but before close cover.
3. Fixture will take 24-48 hours aging test after finished.
4. Each batch production we will take around 5% quantity to do hang test.
5.Each batch production we will 5% quantity to do vibration.
6. All packages passed crash test whch we fall the devices from 5M height.

 

 

Which payment and transportation do you want to choose?

Payment & Shipping

Where is Company? 

Company Profile

 How to go to my home?